Areas of Concern

River River Drops of rain on a leaf

Demolition Area 1 Groundwater Plume - Remedy Selection Plan

The Remedy Selection Plan for the Demolition Area 1 Groundwater Plume is available in its entirety for viewing or downloading in PDF format below. Individual links to the map and summary table from the Plan are also available.

A public comment period for this document was held from August 22, 2005 through September 19, 2005.

Remedy Selection Plan for the Demoliation Area 1 Groundwater Plume Remedy Selection Plan for the Demolition Area 1 Groundwater Plume
(includes text, figure and summary table)
Conceptual Design of the Proposed Remedy Figure 1 (Revised) - Conceptual Design of the Proposed Remedy (Alternative 5)
Table 1 - Summary of Alternatives Table 1 - Summary of Alternatives
(from the Remedy Selection Plan)

Click here to see the final version of the Feasibility Study Demo 1 Groundwater Operable Unit .

Site Map | Related Links | Comments/Contact Us | Search | Home
Administrative Notice